TOTAL AREA FOR THE PROPOSED HUDA HIGH SCHOOL BUILDING
|
|
UTILITY SPACE
|
TOTAL SFT.
|
|
GROUND FLOOR |
2635.63 |
| 1 |
OFFICE |
162.56 |
| 2 |
STAFF ROOM |
162.56 |
| 3 |
TOILET |
120.00 |
| 4 |
LIBRARY |
176.00 |
| 5 |
STAFF TOILET |
33.00 |
| 6 |
STORE |
26.00 |
| 7 |
PRAYER HALL CUM AUDITORIUM |
1655.50 |
| 8 |
STAIRCASE |
200.00 |
| 9 |
ELEVATOR SHAFT |
100.00 |
|
FIRST FLOOR |
2988.81 |
| 1 |
COMPUTER LAB |
162.56 |
| 2 |
STAFF ROOM |
176.00 |
| 3 |
TOILET |
40.50 |
| 4 |
CLASS ROOMS |
1867.13 |
| 5 |
STAFF TOILET |
33.00 |
| 6 |
STORE |
26.00 |
| 7 |
CORRIDOR |
383.63 |
| 8 |
STAIRCASE |
200.00 |
| 9 |
ELEVATOR SHAFT |
100.00 |
|
SECOND FLOOR |
2979.75 |
| 1 |
PHYSICS LAB |
161.00 |
| 2 |
STAFF ROOM |
182.00 |
| 3 |
PANTRY + TOILET |
27.00 |
| 4 |
CLASS ROOMS |
1867.13 |
| 5 |
TOILET |
33.00 |
| 6 |
STORE |
26.00 |
| 7 |
CORRIDOR |
383.63 |
| 8 |
STAIRCASE |
200.00 |
| 9 |
ELEVATOR SHAFT |
100.00 |
|
THIRD FLOOR |
2979.75 |
| 1 |
CHEMISTRY LAB |
161.00 |
| 2 |
STAFF ROOM |
182.00 |
| 3 |
PANTRY + TOILET |
27.00 |
| 4 |
CLASS ROOMS |
1867.13 |
| 5 |
TOILET |
33.00 |
| 6 |
STORE |
26.00 |
| 7 |
CORRIDOR |
383.63 |
| 8 |
STAIRCASE |
200.00 |
| 9 |
ELEVATOR SHAFT |
100.00 |
|
FOURTH FLOOR |
2979.75 |
| 1 |
BIOLOGY LAB |
161.00 |
| 2 |
STAFF ROOM |
182.00 |
| 3 |
PANTRY + TOILET |
27.00 |
| 4 |
CLASS ROOMS |
1867.13 |
| 5 |
TOILET |
33.00 |
| 6 |
STORE |
26.00 |
| 7 |
CORRIDOR |
383.63 |
| 8 |
STAIRCASE |
200.00 |
| 9 |
ELEVATOR SHAFT |
100.00 |
|
FIFTH FLOOR |
2979.75 |
| 1 |
ACADEMIC COUNSELLOR OFFICE |
161.00 |
| 2 |
STAFF ROOM |
182.00 |
| 3 |
PANTRY + TOILET |
27.00 |
| 4 |
CLASS ROOMS |
1867.13 |
| 5 |
TOILET |
33.00 |
| 6 |
STORE |
26.00 |
| 7 |
CORRIDOR |
383.63 |
| 8 |
STAIRCASE |
200.00 |
| 9 |
ELEVATOR SHAFT |
100.00 |
|
TOTAL AREA |
17543.44 |
| WORKS SCHEDULE |
| 1 |
Foundation in mass concrete with 40% boulders |
| 2 |
First Class Brick Masonry in cement mortar 1:6 from ground level to slab level including DPC |
| 3 |
First class teak wood for doors & windows |
| 4 |
4.5″ thick RCC slab |
| 5 |
Plastering in cement mortar both inside & outside |
| 6 |
Mosaic flooring in all rooms |
| 7 |
Septic tank, Soakage pit & Plumbing works |
| 8 |
Sanitary fixture & fitting for all toilets |
| 9 |
Electric fixtures & fittings |
| 10 |
Water storage tanks |
| 11 |
Boundary wall |
| 12 |
Gate |
| 13 |
Construction of mumty block over stairs & its finishings |
| 14 |
Ceramic tiles dado for toilets |
| 15 |
Parapet & railing at terrace |
| 16 |
Fire-fighting system |
|