Proposed New Building
TOTAL AREA FOR THE PROPOSED HUDA HIGH SCHOOL BUILDING
|
||||
UTILITY SPACE
|
TOTAL SFT.
|
|||
GROUND FLOOR | 2635.63 | |||
1 | OFFICE | 162.56 | ||
2 | STAFF ROOM | 162.56 | ||
3 | TOILET | 120.00 | ||
4 | LIBRARY | 176.00 | ||
5 | STAFF TOILET | 33.00 | ||
6 | STORE | 26.00 | ||
7 | PRAYER HALL CUM AUDITORIUM | 1655.50 | ||
8 | STAIRCASE | 200.00 | ||
9 | ELEVATOR SHAFT | 100.00 | ||
FIRST FLOOR | 2988.81 | |||
1 | COMPUTER LAB | 162.56 | ||
2 | STAFF ROOM | 176.00 | ||
3 | TOILET | 40.50 | ||
4 | CLASS ROOMS | 1867.13 | ||
5 | STAFF TOILET | 33.00 | ||
6 | STORE | 26.00 | ||
7 | CORRIDOR | 383.63 | ||
8 | STAIRCASE | 200.00 | ||
9 | ELEVATOR SHAFT | 100.00 | ||
SECOND FLOOR | 2979.75 | |||
1 | PHYSICS LAB | 161.00 | ||
2 | STAFF ROOM | 182.00 | ||
3 | PANTRY + TOILET | 27.00 | ||
4 | CLASS ROOMS | 1867.13 | ||
5 | TOILET | 33.00 | ||
6 | STORE | 26.00 | ||
7 | CORRIDOR | 383.63 | ||
8 | STAIRCASE | 200.00 | ||
9 | ELEVATOR SHAFT | 100.00 | ||
THIRD FLOOR | 2979.75 | |||
1 | CHEMISTRY LAB | 161.00 | ||
2 | STAFF ROOM | 182.00 | ||
3 | PANTRY + TOILET | 27.00 | ||
4 | CLASS ROOMS | 1867.13 | ||
5 | TOILET | 33.00 | ||
6 | STORE | 26.00 | ||
7 | CORRIDOR | 383.63 | ||
8 | STAIRCASE | 200.00 | ||
9 | ELEVATOR SHAFT | 100.00 | ||
FOURTH FLOOR | 2979.75 | |||
1 | BIOLOGY LAB | 161.00 | ||
2 | STAFF ROOM | 182.00 | ||
3 | PANTRY + TOILET | 27.00 | ||
4 | CLASS ROOMS | 1867.13 | ||
5 | TOILET | 33.00 | ||
6 | STORE | 26.00 | ||
7 | CORRIDOR | 383.63 | ||
8 | STAIRCASE | 200.00 | ||
9 | ELEVATOR SHAFT | 100.00 | ||
FIFTH FLOOR | 2979.75 | |||
1 | ACADEMIC COUNSELLOR OFFICE | 161.00 | ||
2 | STAFF ROOM | 182.00 | ||
3 | PANTRY + TOILET | 27.00 | ||
4 | CLASS ROOMS | 1867.13 | ||
5 | TOILET | 33.00 | ||
6 | STORE | 26.00 | ||
7 | CORRIDOR | 383.63 | ||
8 | STAIRCASE | 200.00 | ||
9 | ELEVATOR SHAFT | 100.00 | ||
TOTAL AREA | 17543.44 | |||
WORKS SCHEDULE | ||||
1 | Foundation in mass concrete with 40% boulders | |||
2 | First Class Brick Masonry in cement mortar 1:6 from ground level to slab level including DPC | |||
3 | First class teak wood for doors & windows | |||
4 | 4.5″ thick RCC slab | |||
5 | Plastering in cement mortar both inside & outside | |||
6 | Mosaic flooring in all rooms | |||
7 | Septic tank, Soakage pit & Plumbing works | |||
8 | Sanitary fixture & fitting for all toilets | |||
9 | Electric fixtures & fittings | |||
10 | Water storage tanks | |||
11 | Boundary wall | |||
12 | Gate | |||
13 | Construction of mumty block over stairs & its finishings | |||
14 | Ceramic tiles dado for toilets | |||
15 | Parapet & railing at terrace | |||
16 | Fire-fighting system | |||