Proposed New Building

 

TOTAL AREA FOR THE PROPOSED HUDA HIGH SCHOOL BUILDING


UTILITY SPACE


TOTAL SFT.


GROUND FLOOR 2635.63
1 OFFICE 162.56
2 STAFF ROOM 162.56
3 TOILET 120.00
4 LIBRARY 176.00
5 STAFF TOILET 33.00
6 STORE 26.00
7 PRAYER HALL CUM AUDITORIUM 1655.50
8 STAIRCASE 200.00
9 ELEVATOR SHAFT 100.00
FIRST FLOOR 2988.81
1 COMPUTER LAB 162.56
2 STAFF ROOM 176.00
3 TOILET 40.50
4 CLASS ROOMS 1867.13
5 STAFF TOILET 33.00
6 STORE 26.00
7 CORRIDOR 383.63
8 STAIRCASE 200.00
9 ELEVATOR SHAFT 100.00
SECOND FLOOR 2979.75
1 PHYSICS LAB 161.00
2 STAFF ROOM 182.00
3 PANTRY + TOILET 27.00
4 CLASS ROOMS 1867.13
5 TOILET 33.00
6 STORE 26.00
7 CORRIDOR 383.63
8 STAIRCASE 200.00
9 ELEVATOR SHAFT 100.00
THIRD FLOOR 2979.75
1 CHEMISTRY LAB 161.00
2 STAFF ROOM 182.00
3 PANTRY + TOILET 27.00
4 CLASS ROOMS 1867.13
5 TOILET 33.00
6 STORE 26.00
7 CORRIDOR 383.63
8 STAIRCASE 200.00
9 ELEVATOR SHAFT 100.00
FOURTH FLOOR 2979.75
1 BIOLOGY LAB 161.00
2 STAFF ROOM 182.00
3 PANTRY + TOILET 27.00
4 CLASS ROOMS 1867.13
5 TOILET 33.00
6 STORE 26.00
7 CORRIDOR 383.63
8 STAIRCASE 200.00
9 ELEVATOR SHAFT 100.00
FIFTH FLOOR 2979.75
1 ACADEMIC COUNSELLOR OFFICE 161.00
2 STAFF ROOM 182.00
3 PANTRY + TOILET 27.00
4 CLASS ROOMS 1867.13
5 TOILET 33.00
6 STORE 26.00
7 CORRIDOR 383.63
8 STAIRCASE 200.00
9 ELEVATOR SHAFT 100.00
TOTAL AREA 17543.44
WORKS SCHEDULE
1 Foundation in mass concrete with 40% boulders
2 First Class Brick Masonry in cement mortar 1:6 from ground level to slab level including DPC
3 First class teak wood for doors & windows
4 4.5″ thick RCC slab
5 Plastering in cement mortar both inside & outside
6 Mosaic flooring in all rooms
7 Septic tank, Soakage pit & Plumbing works
8 Sanitary fixture & fitting for all toilets
9 Electric fixtures & fittings
10 Water storage tanks
11 Boundary wall
12 Gate
13 Construction of mumty block over stairs & its finishings
14 Ceramic tiles dado for toilets
15 Parapet & railing at terrace
16 Fire-fighting system